Injection Molding OEE Monitoring — Real-Time Availability,
Performance, and Quality
Shift after shift, IMM by IMM — cut downtime, reduce rejects, and keep every press on target without spreadsheets or guesswork.
Why you’re leaving money on the table
- Downtime and rejects are often discovered too late to act.
- Slow cycles and micro-stops silently erode cycle time and throughput.
- Manual spreadsheets hide where time and yield are lost.
- Mixed fleets of old and new IMMs make standardized monitoring
impossible.
If you can’t see it in real time, you can’t improve it. With live
monitoring, you see what’s happening now—and why—so your team
can intervene before losses snowball.
Trusted by plastics manufacturers across North America
Stop Guessing. Start Seeing.
Without monitoring
Downtime visibility
Hidden until the shift report
Scrap control
Piles up before anyone notices
Cycle time tracking
Creep goes undetected for days
Team efficiency
Hours lost to spreadsheet reconciliation
With Clariprod
Reduce downtime
Instant alerts and validated stop reasons
Reduce scrap
Catch reject trends before they spread
Optimize cycle time
Across every mold and job
Act on data
Free your team to fix problems, not chase them
The Clariprod advantage
- 1. Fast Rollout on Any IMM
Install a plug-and-play controller in ~15 minutes per press. - 2. Live OEE & Dashboards
See availability, performance, and quality in real time, with alerts for
drift or downtime. - 3. Standardized Data for Plastics
Downtime codes and reject reasons built for injection molding, so teams
fix the right issues first. - 4. Cloud Portal for the Whole Plant
Dashboards, KPIs, and automated reports accessible from anywhere. - 5. ROI in Weeks, Not Months
Customers recover their investment rapidly through less downtime,
fewer rejects, and higher throughput.


Benefits for plastics teams
- Less unplanned downtime with clear, validated reasons.
- Fewer rejects by tackling top scrap drivers early.
- Higher, steadier throughput across molds, jobs, and shifts.
- Standardized OEE data across every IMM.
- Automated reporting that eliminates manual spreadsheets.
- Scalable across sites, secure on AWS cloud.
Proof from the shop floor
On average at Windmill Plastics, running 1 second over the standard cycle time on an average cycle of 20 seconds costs us approximately $500 a week on one single machine. Our Clariprod data shows we have saved at least that amount on a number of our machines.

43%
productivity increase

$2,000/month
cycle-time savings per affected IMM
What Happens Next
Watch the demo
See Clariprod in action — 2 minutes, no commitment.
Free consultation
We'll assess your shop floor and answer your questions.
Pilot on 2–3 IMMs
Start small, prove the value, then scale across your plant.
Q&A
No commitment • 10-minute watch






